Licensed, insured and built to Idaho plumbing code

Bathtub to shower conversion Pocatello ID done right the first time

If your old tub is cracked, stained, or just plain hard to step into, a bathtub to shower conversion Pocatello ID homeowners trust starts with a free on-site measure and a written price. We handle demolition, plumbing, waterproofing, tile and glass in one crew, so you are not juggling three contractors. Most conversions wrap in three to five working days.

Bathtub-to-Shower Conversion in pocatello, Idaho
Careful work. Honest options.
About this service

What a bathtub to shower conversion Pocatello ID actually involves

A bathtub to shower conversion Pocatello ID is a bathroom remodel that removes an existing tub and builds a code-compliant walk-in shower in the same footprint. We cut out the tub, cap or reroute the drain, replace the valve with a pressure-balanced or thermostatic unit, hang cement backer board, roll on a waterproofing membrane, then set ceramic tile or porcelain tile and grout it. A laser level keeps the pan and curb square, and a moisture meter confirms the subfloor is dry before anything goes back down.

Most Pocatello homes were built between the 1950s and 1990s, and the original tubs are at the end of their life. Cast iron pans rust through, acrylic shells flex and crack, and the tile surround behind them hides water damage you cannot see. If you have been searching for a tub to shower conversion Pocatello Idaho near me, we handle the whole job: plumbing, electrical for the new light and exhaust fan, drywall, paint and final clean-up. You get one crew, one schedule, one warranty.

  • ✓ Safer step-in height
  • ✓ Stops hidden water damage
  • ✓ More usable floor space
  • ✓ Lower water and heating bills
What's included

What is included in a conversion

Every conversion we quote covers demo, disposal, plumbing, waterproofing, tile, grout and final clean-up. Glass, tile upgrades and any rot repair found behind the wall are quoted separately so you see the cost before we proceed.

01
✓

Tub removal and haul-away

We pull the tub, surround and old valve, protect the floor and hallway, and haul everything to the dump. Cast iron tubs get cut on site because they will not fit through a standard Pocatello bathroom door.

02
✓

New drain and shower valve

We set a new drain and install a pressure-balanced or thermostatic valve with PEX piping or copper piping. Every connection is tested for leaks before the wall closes, and the work is covered by our State of Idaho Plumbing License.

03
✓

Waterproofing system

Cement backer board, taped seams, and a bonded waterproofing membrane at the pan, curb, corners and valve wall. We flood-test the pan before tile goes down. This is the step that decides how long your shower lasts.

04
✓

Tile, grout and sealant

Ceramic tile or porcelain tile set with a wet saw, tile spacers and a laser level for straight lines. We grout with a float, then seal with silicone caulk at the changes of plane so nothing cracks.

05
✓

Exhaust fan and lighting check

We confirm your exhaust fan moves air and your shower light is damp-rated. If either is failing, we quote a replacement while the wall is open, which saves you a second tear-out later.

06
✓

Final clean and walkthrough

We wipe down the tile, remove all debris, and walk you through the valve, drain and glass. You get a written warranty and a bathroom that is ready to use the same day we finish.

How it works

How our conversion process works

We come out, measure the alcove, check the drain location and valve type, and look at the subfloor. You get a written price the same day, itemized by labor and material. No deposit until you approve the scope. Most quotes take 45 minutes on site.

Day one is tear-out. We protect the floor and hallway, pull the tub and surround, and haul everything to the dump. Then we set the new drain, solder or crimp the PEX piping, and install the new shower valve. A State of Idaho Plumbing License covers every connection we make.

Day two is the part nobody sees and everybody needs. We hang cement backer board, tape and mud the seams, then roll on a waterproofing membrane at the pan, corners and valve wall. A Schluter system goes in on most jobs. This is the layer that decides whether your shower lasts 10 years or 30.

Day three and four are tile. We cut with a wet saw, set with tile spacers and a laser level, then grout and seal. Daltile and MSI porcelain tile are our most-requested picks because they hold up to Pocatello's dry winters and hard water. Grout lines stay tight and even.

Final day we hang the shower door, install the trim, caulk with silicone caulk, and test the valve for temperature and pressure. We run the exhaust fan, check for leaks at the pan, and walk you through the whole install. You get a written warranty and a clean bathroom.

Bathtub-to-Shower Conversion
STEP 01Free measure and quote

We come out, measure the alcove, check the drain location and valve type, and look at the subfloor. You get a written price the same day, itemized by labor and material. No deposit until you approve the scope. Most quotes take 45 minutes on site.

Tools & methods

Tools and methods we use

01
✓

Wet saw

Cuts porcelain tile and ceramic tile cleanly without chipping the glaze. Essential for tight cuts around the valve and drain.

02
✓

Laser level

Keeps the pan, curb and tile rows dead square. A shower that is out of level by a quarter inch shows up as a crooked grout line.

03
✓

Moisture meter

Checks the subfloor and framing for hidden water damage before we close the wall. If the reading is high, we stop and fix the source.

04
✓

Oscillating multi-tool

Cuts backer board, trims studs and removes old caulk without damaging surrounding surfaces. Saves hours on demo day.

05
✓

Pipe wrench and plumber's snake

Sets the new valve and clears any clogged drain before the pan goes down. Better to find a blockage now than after tile.

06
✓

Caulking gun

Applies silicone caulk at every change of plane. Grout cracks at corners; caulk flexes and stays sealed.

Real results

Before and after.

Rusted cast iron tub to low-curb tile shower
Bathtub-to-Shower Conversion

Rusted cast iron tub to low-curb tile shower

A 1970s cast iron tub in a Highland Area ranch house had rusted through the pan and was leaking into the ceiling below. The surround tile was cracked and the framing behind it was soft.

After: We cut out the tub, replaced two soft studs and a section of subfloor, and built a 36x60 low-curb shower with porcelain tile, a bench and a frameless glass door. The leak stopped and the ceiling below dried out.

Book this service →
Cramped 5x8 hall bath gains floor space
Bathtub-to-Shower Conversion

Cramped 5x8 hall bath gains floor space

A small hall bathroom in Old Town had a 60-inch tub that ate most of the room. The vanity was 24 inches wide and the door barely cleared the tub apron.

After: We removed the tub and installed a 36-inch shower on the short wall, which freed up roughly 14 square feet. A 36-inch vanity and a linen tower now fit where the tub used to be.

Book this service →
Moldy tub surround rebuilt with proper waterproofing
Bathtub-to-Shower Conversion

Moldy tub surround rebuilt with proper waterproofing

A Johnny Creek bathroom had a musty smell and recurring mold at the tub corners. The old surround was set on green board with painted-on sealer, and the exhaust fan had stopped working years earlier.

After: We pulled the surround, treated the framing, and rebuilt with cement backer board and a bonded waterproofing membrane. A new exhaust fan now clears the mirror in about two minutes, and the smell is gone.

Book this service →
Problems we solve

Problems an affordable tub to shower conversion in Pocatello ID solves

Most of the calls we get are not about style. They are about a tub that leaks, a step that is too high, or a wall that has been wet for years. Here is what we fix.

Ask a pro →
01

Cracked or rusted tub pan leaking into the floor

We pull the tub, inspect the subfloor with a moisture meter, replace any soft plywood, and set a new shower pan over a properly prepped, level base. The leak stops at the source instead of getting patched.

↗
02

High tub wall that is hard to step over

We build a low-curb or curbless shower with a 2 to 4 inch entry, add a bench seat and block the walls for grab bars. The result meets ADA Compliance Certification standards if you need it to.

↗
03

Mold and mildew behind the old tile surround

We remove the old surround, treat the framing, and rebuild with cement backer board and a waterproofing membrane. Combined with a working exhaust fan, that keeps the cavity dry.

↗
04

Leaking shower valve or low water pressure

We replace the valve with a modern pressure-balanced Moen, Delta or Grohe unit and flush the lines. Since the wall is already open during a conversion, this is the cheapest time to do it.

↗
Proof you can check

Licensed, insured and warrantied

  • State of Idaho Plumbing License · Idaho Division of Occupational and Professional Licenses
  • State of Idaho Electrical License · Idaho Division of Occupational and Professional Licenses
  • EPA Lead-Safe Certified Firm · U.S. Environmental Protection Agency
  • TCNA Tile Installation Certification · Tile Council of North America
  • OSHA 10 and OSHA 30 · Occupational Safety and Health Administration
Good questions

Frequently asked questions

+19863369053 →

Typical 2026 pricing in Pocatello runs $6,500 to $14,500 for a full conversion, depending on tile choice, glass, and whether we find water damage behind the wall. A basic acrylic pan and surround sits at the low end. Porcelain tile with a frameless glass door and a bench lands at the top. We give you a written price after a free on-site measure.

Most jobs take three to five working days once we start. Day one is demo and rough plumbing, day two is waterproofing, days three and four are tile, and the final day is glass, trim and testing. If we find rot or need to reroute a drain, add one to two days. We schedule the whole block up front so you know the finish date.

Yes, if we are moving or replacing the drain, valve or any electrical circuit, the City of Pocatello requires a plumbing and electrical permit. We pull it in your name, meet the inspector on site, and hand you the signed-off card. Cosmetic-only swaps that reuse the existing drain and valve sometimes skip the permit, and we will tell you which applies to your job.

You get a safer 2 to 4 inch step-in instead of a 14 to 17 inch tub wall, roughly 12 to 15 square feet of reclaimed floor space, and lower hot water use. You also get a chance to fix the water damage hiding behind the old surround. For aging parents or anyone with mobility issues, a low-curb shower with grab bars is often the difference between bathing safely and needing help.

Ready when you are

Get your bathtub to shower conversion Pocatello ID quote

Call BathFlow Remodeling at (986) 336-9053 for a free on-site measure and a written price. We are licensed, insured and warrantied, and we answer the phone. Most quotes go out the same day you call.

Get Free Quote +19863369053 →
Request an appointment

Contact our Pocatello bathroom crew

Call us or send a message and we will get back to you the same business day. We schedule estimates Monday through Friday and can usually get to a Pocatello address within a few days. Tell us what is going on with the bathroom and we will tell you what it takes to fix it.

↗
Emergency?Call now